Finally concrete!!! Huge pour day included a large crew + a pump truck we had to get because of the heated floors. Progress Report 10 – 30×48′ Pole Barn buildFebruary 23, 2021 in 30x48 Pole Barn Shop Build / Shop Tours! tagged 2 post lift / Breezeway / EPS / Foam / Garage / Heat / heated Floor / House / Hydronic / List / Manifold / Oxygen Barrier / Parts / Pex / Pole Barn / Post Frame / Radiant / Shop / Staple / Welding / XPS by Paul
1 The issue we are repairing today is how to fix the LF “Long Fill” “Low Flow” error on a Whirlpool Cabrio Platinum in about an hour for less than $100. How to Repair Whirlpool Cabrio LF Long Fill Error with ...February 22, 2021 in MISCELLANEOUS / Uncategorized tagged Cabrio / Error / LF / Low Fill / Low Flow / Platinum / PS11731257 / Stops / W10326913 / W10342320 / W10853723 / W10853723VP / Water Inlet Valve / Whirlpool / WPW10326913 / WTW8240YW0 by Paul
Today we finish up installing the foam, staple down the PEX tubing for the radiant heat, and set up the manifold. Also, the plumbers rough in for the shower, toilet, and sink! Progress Report 9 – 30×48′ Pole Barn buildFebruary 14, 2021 in 30x48 Pole Barn Shop Build / Shop Tours! tagged 2 post lift / Breezeway / EPS / Foam / Garage / Heat / heated Floor / House / Hydronic / List / Manifold / Oxygen Barrier / Parts / Pex / Pole Barn / Post Frame / Radiant / Shop / Staple / Welding / XPS by Paul
Today we prep for the radiant heated floor tubing by laying down the foam, building forms, and double checking layout measurements. Progress Report 8 – 30×48′ Pole Barn buildFebruary 7, 2021 in 30x48 Pole Barn Shop Build / Shop Tours! tagged 2 post lift / Breezeway / EPS / Foam / Garage / Heat / heated Floor / House / Hydronic / List / Manifold / Oxygen Barrier / Parts / Pex / Pole Barn / Post Frame / Radiant / Shop / Staple / Welding / XPS by Paul