1 Finally concrete! In this post we cover the concrete pour and final results of the new driveway. Also, I drag home some more projects and a new (to me) tow rig! Progress Report 15 – 30×48′ Pole Barn buildAugust 29, 2021 in 30x48 Pole Barn Shop Build / Shop Tours! tagged 2 post lift / Breezeway / EPS / Foam / Garage / Heat / heated Floor / House / Hydronic / List / Manifold / Oxygen Barrier / Parts / Pex / Pole Barn / Post Frame / Radiant / Shop / Staple / Welding / XPS by Paul
We bring in the big(er) guns to work on the final grade, septic riser, and trenching for gutter drains. There will be a large driveway and we need to make sure there is enough drainage to get all the water out and away from the foundation and septic systems. Progress Report 14 – 30×48′ Pole Barn buildAugust 16, 2021 in 30x48 Pole Barn Shop Build / Shop Tours! tagged 2 post lift / Breezeway / EPS / Foam / Garage / Heat / heated Floor / House / Hydronic / List / Manifold / Oxygen Barrier / Parts / Pex / Pole Barn / Post Frame / Radiant / Shop / Staple / Welding / XPS by Paul
1 Picture dump! Lots of progress and projects since the last update. This time we get electrical, trenching, drainage, and I drag a bunch of junk home from FB Marketplace! Progress Report 13 – 30×48′ Pole Barn buildAugust 3, 2021 in 30x48 Pole Barn Shop Build / Shop Tours! tagged 2 post lift / Breezeway / EPS / Foam / Garage / Heat / heated Floor / House / Hydronic / List / Manifold / Oxygen Barrier / Parts / Pex / Pole Barn / Post Frame / Radiant / Shop / Staple / Welding / XPS by Paul