Today we trench with a mini excavator, have footings poured for the future bathroom, make a drill bit, and the crew gets the walls up and framed in one day! Progress Report 4 – 30×48′ Pole Barn buildJanuary 10, 2021 in 30x48 Pole Barn Shop Build / Shop Tours! tagged 2 post lift / Breezeway / EPS / Foam / Garage / Heat / heated Floor / House / Hydronic / List / Manifold / Oxygen Barrier / Parts / Pex / Pole Barn / Post Frame / Radiant / Shop / Staple / Welding / XPS by Paul