In today’s update, the crew raises the trusses with a custom skid steer attachment, finish the framing, and start installing the insulation and metal sheeting.
Today we trench with a mini excavator, have footings poured for the future bathroom, make a drill bit, and the crew gets the walls up and framed in one day!
Check out this information packed article for my research, tubing layout, and a detailed list with links for all the parts I bought. I spent a LONG time researching all of the different things I needed to buy to install the radiant flooring myself in my pole barn before the […]